Projected Concern

Means an issue or problem with an element that is expected to arise at any time within the five years following the date of inspection of the facility based on the condition of the element at time of inspection and its theoretical life expectancy. 

Projected concerns are identified in the FCA as requiring maintenance, repairs, or replacement, along with the anticipated cost of such maintenance, repair, or replacement and the year in which the maintenance, repair, or replacement should be anticipated. 

Projected Concerns are captured in the Extended Facility Condition Index (EFCI).