Preservation Needs    
 1.  Maintenance Plan The Maintenance Plan provides an inventory of all assets.
The Maintenance Plan identifies the location of each type of asset.
Maintenance Plans do not always indicate the replacement value of the assets or the annual maintenance costs. - - 1 Maintenance plans require periodic updates to reflect the changing condition of the assets. Depending on the type of maintenance plan, the means, methods, techniques and sequences are left to the discretion of the service contractors and are not prescribed within the plan/manual. -
           Single Season
 2.  Maintenance Review The Maintenance Review contemplates all the assets that were identified in the Maintenance Plan. Maintenance reviews generally do not repeat the baseline data that is recorded in the maintenance plan. Therefore, detailed information about the location of the various assets is not part of this service scope.
- Condition evaluation is limited only to a visual assessment of maintenance backlog identification. No destructive testing is carried out.
1 1 1 1 -
      Major maintenance intervals
      Routine maintenance intervals
 3.  Warranty Review Warranty reviews are limited to those assets that are still covered under warranty. All other assets are not considered as part of this service. The Warranty Review only indicates the location of those assets that are still covered under warranty. - 1 Warranty reviews often include recommendations that any warranty defect should be referred to the warranty provider. Any deficiencies that are not warranty claims (such as general maintenance items) are not necessarily quantified as part of the warranty review. The warranty review may identify a list of claims that should be referred to the warranty provider. - -
4.  Recordkeepings - logbooks
Capital Needs
 4.  Statistical analysis - rapidBAMS - - - - - 1 - - 1
 4.  Reserve Study 1 1 q Only provides a "Level 1" assessment that indicates the "effective age" of the assets. - 1 - - 1
       4b  Methodology review
 5.  Capital Needs Assessment (CNA) 1
1 1 - - 1 - - 1
 6.  Life Cycle Audit 1 1 1 - - - - - 1
Physical Needs
 7.  Facility Condition Asessment (FCA) 1 1 Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. 1 1 1 1 The FCA will identify deficiencies but will not necessarily include a detailed repair strategy. Conceptual repair strategies may be included depending on the scope of services. -
 8.  Pre-Purchase Due diligence 1 - - 1 - 1 1 - -
Project Needs
1.  Project  Planning - tactical plan review 1
2.  Prioritization of Projects 1
3.  Detailed project research - business case development 1
4.  Consultant, specs, tender 1
Adaptation Needs
 9.   Code Review Maintenance reviews generally do not repeat the baseline data that is recorded in the maintenance plan. Therefore, detailed information about the location of the various assets is not part of this service scope. Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. - 1 - -
10.  Seismic Review Maintenance reviews generally do not repeat the baseline data that is recorded in the maintenance plan. Therefore, detailed information about the location of the various assets is not part of this service scope. Maintenance reviews generally do not repeat the baseline data that is recorded in the maintenance plan. Therefore, detailed information about the location of the various assets is not part of this service scope. - -
11.  Hazmat Assessment Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. - 1 - -
12.  Facility Peformance Evaluation (FPE) Maintenance reviews generally do not repeat the baseline data that is recorded in the maintenance plan. Therefore, detailed information about the location of the various assets is not part of this service scope. 1 - 1 - -
13.  Energy Audit Maintenance reviews generally do not repeat the baseline data that is recorded in the maintenance plan. Therefore, detailed information about the location of the various assets is not part of this service scope. Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. - 1 - -
Governance of Needs
14.  Steward of the Plan - - - - - - 1 1 1
15.  CMMS 1 - - - - - - - 1
Operational Needs Admin. Time Site Time Fee
0.  Gap Analysis 1 - -
0.  Inventory of Assets 1 1 - 4-6 hrs 2 hrs $600
0.  Contact List - - - 2 hrs - $300
1.  Schedule of Documents (SODO) Maintenance reviews generally do not repeat the baseline data that is recorded in the maintenance plan. Therefore, detailed information about the location of the various assets is not part of this service scope. - - 2-10 hrs 1 hrs $800
2.  Schedule of Events (SOHE) Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. - - 3 hrs - $400
3.  Schedule of Isolation Points (SOIP) Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. Maintenance reviews generally do not repeat the baseline data that is recorded in the maintenance plan. Therefore, detailed information about the location of the various assets is not part of this service scope. - 1 hr  2 hrs $300
4.  Schedule of Equip & Supplies (SOES) Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. - - 1 hr 1 hr $200
5.  Schedule of Tags and Certs (SOTC) Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. - 1 hr 1 hr $200
6.  Schedule of Logs & S reports (SOLS) Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. - 2 hrs 1 hr $300
7.  Schedule of Warranty Exp. (SOWE) Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. - - 4 hrs - $400
8.  Schedule of Maint/Insp (SOMI) 1 Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. - 30 hrs 4 hrs $3,000
9.  Schedule of Service Agr. (SOSA) Maintenance reviews generally do not repeat the baseline data that is recorded in the maintenance plan. Therefore, detailed information about the location of the various assets is not part of this service scope. Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. - 4 hrs - $400
10.  Schedule of Investments (SOIN) - - Facility assessments will not generally include the renewal cost for assets that have not been identified as requiring urgent repair or renewal. The FCA focus is primarily on assets that currently exhibit problems. 1 hr - $100


How to use the matrix:
  • Cross reference the nine questions (A,B,C...) with the 14 services (1,2,3...)  
  • Hover over the symbols for an explanation on the utility relative to the nine questions
  • Click the blue links for more information about each service type


1   Full value in all circumstances
1   Partial or contingent value
1   Limited value
 -    No direct value