Home        About       News       Library       Contact
1

FCI Delta
The change in the FCI from one facility condition assessment (FCA) to the next re-assessment.

Changes can result from legitimate deterioration of the backlog (ie., condition drift) or from the following formulaic issues:

Some other factors affecting the delta:


See also:


(c) Copyright Asset Insights, 2000-2013, All Rights Reserved - "Insight, foresight and oversight of assets"