Asset Insights
Home    A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z

PACER
Pacing
Panelboard Labels
Parameter
Parametric Assessment
Parametric Cost Estimate
Parametric Cost Model
Parametric Reinvestment Model
Parent-Child Relationship

Partial Loss
Parts
Parts Inventory
PAS 55
Past Event
Patent Defect
Pavement Condition Index
Payback
PCI
Peace of Mind
Pending Project
Penetration Placeholder
Percent Funded
Percent Good

Percent of CRV
Percent Surviving
Performance
Performance Curve
Performance in Use
Performance in Use Value

Performance Indicator (PI)
Performance Testing
Periodic Table of Asset Management (PTAM)
Permanent Repair
Pessimistic
P-F Curve
P-F Interval
Phased Development
Phase Dispersion
Phased Project
Physical Analysis
Physical Assets
Physical Deterioration
Physical Life
Physical Needs Assessment (PNA)
Piecemeal
Piggy-Back
Pilot Assessment
Pilot Project
PIP
Placed in Service (Date)
Placeholder Asset
Placeholder Concern
Placeholder Cost
Placeholder Recommendation
Plan
Planned Maintenance
Planned Obsolescence
Planned Replacement
Planned Work Order
Planning Horizon
Planning Window
PNA
PoF
Poisson Distribution
Policy
Policy Maker
Pooled Method
"Poor"
"Poor" Funding Level

"Poor " Performers
Portable Asset
Portfolio
Portfolio Average FCI
Portfolio Building FCI Comparison
Portfolio Condition-Priority Matrix
Portfolio Criticality Matrix
Portfolio FCI Distribution
Portfolio Manager
Positive Ageing
Positive Skewness
Postdated
Post-F Period
Post Warranty Period
Potential Failure
Potential Life
Potential Project
PP&E
Prediction
Prediction Techniques (for life)
Prediction Techniques (for Potential & Functional Failure
Potentially Critical
PRA
Predictive Funding
Predictive Maintenance (PdM)
Predictive Testing & Inspection (PT&I)
Preliminary Budget
Preliminary FCI
Premature Ageing
Premature Failure
Premises
"Pre-Natal" Lifecycle Stage
Pre-P Period

Pre-Purchase Due Diligence
Present Value (PV)

Preservation
Preventative Maintenance
Preventive Replacement Policy
Primary Action
Primary Function
Primary Occupancy
Prioritization Techniques
Priority
Priority-Condition Matrix
Priority Criterion

Priority Index
Priority Levels
Priority Ranking
Priority Scale/Levels
Private Infrastructure
Proactive
Proactive Maintenance
Probability
Probable Life
Probability of Failure (PoF)
Probabilistic Model
Probabilistic Risk Assessment (PRA)
Probability Dispersion
Probability Distribution
Product Incentive Programs (PIP)
Professional Reserve Analyst (PRA)
Prognosis
Prognostics Preventative Maintenance Clock
Program
Program Budget
Progressive Reserve
Project
Projected Concern
Projected FCI

Projection
Project Manager
Project Management
Projects, Capital
Proposed Budget
Pro Rata
Prospective Buyer
Protective Recoatings
Proximity (Time)
Proximity Load
Proximity Placeholder
Prudent
PSAB 3150
Public Infrastructure
Purchase Order
Purpose

(c) Copyright Asset Insights, 2000-2013, All Rights Reserved - "Insight, foresight and oversight of assets"